Work party to install the New Tool Storage Cabinet
30th September 2023, 09:00 - 12:00
Plan as follows:
- Remove all equipment and tools from existing cabinet
- disassemble and discard old cabinet
- remove old signal flag cabinet and any wall mounted equipment/boxes
- install security bolts in wall to ensure cabinet security
- sweep,clean and paint area
- re-install radio box and key safe
- install new cabinet and repack equipment being kept
- manufacture and install rope racks into old corner cabinet(turn to face forward)